Re: Aman III Progress
wow , i didnt notice this feature.. maybe is the feature they included for the pool design on 27 floor later...TANHONGTAT wrote:Anyone can enlight me is there this pipe in AH 1 and AH2 (Seems like connecting everyfloor. There is also some hole on top the toilet window, is it for ventilation of the plaster ceiling in bathroom?
Thanks
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
Tat is the drain pipe which connect to ur yard, so tat v can put our washing machine at the yard there. The hole above the toilet window is for aircond piping to come out n connect to the compressor unit which v put in front of the yard window.
tionwooi- Global Moderators
- Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan
Re: Aman III Progress
i notice something new when i was monitoring the progress of AM 3... i saw a few unit at AM2 installing grill and even window panel on their balcony ... these are the units facing the cahaya villa there... are those permit-able? No pun intended ya...
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
Certain lower level like level 1 is allowed to do so, other than that is illegal lor...
yeepie- Posts : 407
Join date : 2009-06-21
Re: Aman III Progress
Some updates taken on 6 Jan 2013.
Now it is on level 17. 9 more levels to go.
Now it is on level 17. 9 more levels to go.
TANHONGTAT- Posts : 53
Join date : 2011-06-06
Re: Aman III Progress
Hong tat thx for the update... Btw how u go in ya.. Jus went in as a visitor is it... Wat u normally tell the guard
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
aman height have funny ways of building...they finish each floor up and not build the whole skeleton to the top 1st... i am a bit scare on the top level where there is a pool siting on it...
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.
As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.
Meira- Posts : 4
Join date : 2012-10-11
Re: Aman III Progress
Where got such thing as document to offset LAD with discount?
If u really signed such a doc then u just got conned by PC. Check back ur SnP.
If u really signed such a doc then u just got conned by PC. Check back ur SnP.
GW- Posts : 743
Join date : 2009-11-27
Re: Aman III Progress
Meira wrote:Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.
As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.
Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.
cm- Posts : 185
Join date : 2009-10-11
Re: Aman III Progress
cm wrote:Meira wrote:Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.
As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.
Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.
From what I know .. is they will still compensate you but again with the discount of 5%... This is because of the 5% they give you as discount too...
davidlow7- Posts : 5
Join date : 2012-10-11
Re: Aman III Progress
Yesterday beside Aman Height caught on fire accident? Can anyone here confirm? Will it delay the construction further more?
Pisaro- Posts : 2
Join date : 2011-04-21
Re: Aman III Progress
visited it last week, they are currently focusing on building up the parking lot... i guess becos they need to build a bridge across to aman 3 so they wanna do that 1st kot... i didnt c any progress on aman3 though... any1 from aman2 mind taking some photo of aman 3 from atop?
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
Any new development surrounding Aman Heights especially the road access?? went to Aman Heights look at the project, as xavier said, they focus more on car park area, building itself not much different.
road access wise still the same, need to use the only main road climb up the hill only reach our condo :(any possibility that a new access road be opened behind the bungalows at Serdang Heights there?
road access wise still the same, need to use the only main road climb up the hill only reach our condo :(any possibility that a new access road be opened behind the bungalows at Serdang Heights there?
samjitkw- Posts : 4
Join date : 2011-10-08
Age : 42
Location : Kuala Lumpur
Re: Aman III Progress
davidlow7 wrote:cm wrote:Meira wrote:Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.
As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.
Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.
From what I know .. is they will still compensate you but again with the discount of 5%... This is because of the 5% they give you as discount too...
Oh.. alright. Any news of when they will complete the whole block?
Meira- Posts : 4
Join date : 2012-10-11
Re: Aman III Progress
I am hoping if someone cares to post the latest progress for Aman C?
Thanks a lot
Thanks a lot
davidlow7- Posts : 5
Join date : 2012-10-11
Re: Aman III Progress
davidlow7,
You can view the latest photos here
You can view the latest photos here
samjitkw- Posts : 4
Join date : 2011-10-08
Age : 42
Location : Kuala Lumpur
Re: Aman III Progress
hi, if my snp is signed on august 2010 , does it mean if by august 2013 , premier consortium yet to hand off key.. we can start collecting compensation from them? looking at the progress i doubt it will be completed with cf by august.
xavier668- Posts : 115
Join date : 2011-06-14
Re: Aman III Progress
Jus like Aman I n II delay. Last time they gif Aman II buyer 2 options.
1.) They ask for discount on the total amount of compensation if u wanna to get it in one lump some.
2.) If u wanna to get full amount then they will pay u in 10 posted cheque.
So guy b ready on these.
1.) They ask for discount on the total amount of compensation if u wanna to get it in one lump some.
2.) If u wanna to get full amount then they will pay u in 10 posted cheque.
So guy b ready on these.
tionwooi- Global Moderators
- Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan
Re: Aman III Progress
Complete the building b4 end of tis year should b no problem but CCC (formerly know as CF) only God will know. Hopefully they din repeat the same history delay for about half year jus for the CCC due to local authorities not satisfy wif their things.
tionwooi- Global Moderators
- Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan
Page 7 of 8 • 1, 2, 3, 4, 5, 6, 7, 8
Similar topics
» Aman II Progress
» Aman Heights Is Now Searcheable In Google Map
» O** AHF and Now is Aman Heights Community Forum!
» Updated Picture of Aman Heights
» Facebook Group for Aman Heights Community
» Aman Heights Is Now Searcheable In Google Map
» O** AHF and Now is Aman Heights Community Forum!
» Updated Picture of Aman Heights
» Facebook Group for Aman Heights Community
Page 7 of 8
Permissions in this forum:
You cannot reply to topics in this forum
|
|