Re: Aman III Progress

Post by xavier668 on Mon Nov 26, 2012 7:34 am

TANHONGTAT wrote:Anyone can enlight me is there this pipe in AH 1 and AH2 (Seems like connecting everyfloor. There is also some hole on top the toilet window, is it for ventilation of the plaster ceiling in bathroom?

Thanks

wow , i didnt notice this feature.. maybe is the feature they included for the pool design on 27 floor later...

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Mon Nov 26, 2012 9:15 am

Tat is the drain pipe which connect to ur yard, so tat v can put our washing machine at the yard there. The hole above the toilet window is for aircond piping to come out n connect to the compressor unit which v put in front of the yard window.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Thu Dec 27, 2012 3:42 am

i notice something new when i was monitoring the progress of AM 3... i saw a few unit at AM2 installing grill and even window panel on their balcony ... these are the units facing the cahaya villa there... are those permit-able? No pun intended ya...

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by yeepie on Thu Dec 27, 2012 4:38 pm

Certain lower level like level 1 is allowed to do so, other than that is illegal lor... Laughing
avatar
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Re: Aman III Progress

Post by TANHONGTAT on Wed Jan 09, 2013 6:58 am

Some updates taken on 6 Jan 2013.







Now it is on level 17. 9 more levels to go. Smile

TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Sun Jan 20, 2013 6:44 am

Hong tat thx for the update... Btw how u go in ya.. Jus went in as a visitor is it... Wat u normally tell the guard

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by TANHONGTAT on Sun Jan 20, 2013 7:10 am

I have friend stay there .. Very Happy

TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by eyes1228 on Sun Mar 31, 2013 6:19 pm

any photos update?

eyes1228

Posts : 2
Join date : 2013-03-29

Back to top Go down

Re: Aman III Progress

Post by pmtan on Sat Apr 06, 2013 11:29 am

just drop by and took some updated photo.








pmtan

Posts : 3
Join date : 2011-10-08

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Sat Apr 06, 2013 8:01 pm

aman height have funny ways of building...they finish each floor up and not build the whole skeleton to the top 1st... i am a bit scare on the top level where there is a pool siting on it...

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by Meira on Tue Apr 23, 2013 10:18 am

Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.

As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.

Meira

Posts : 4
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by GW on Wed Apr 24, 2013 10:49 am

Where got such thing as document to offset LAD with discount?
If u really signed such a doc then u just got conned by PC. Check back ur SnP.

GW

Posts : 743
Join date : 2009-11-27

Back to top Go down

Re: Aman III Progress

Post by cm on Fri Apr 26, 2013 4:10 pm

Meira wrote:
Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.

As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.

Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.

cm

Posts : 185
Join date : 2009-10-11

Back to top Go down

Re: Aman III Progress

Post by davidlow7 on Sun Apr 28, 2013 7:27 pm

cm wrote:
Meira wrote:
Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.

As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.

Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.

From what I know .. is they will still compensate you but again with the discount of 5%... This is because of the 5% they give you as discount too...


davidlow7

Posts : 5
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by Pisaro on Wed May 08, 2013 7:29 am

Yesterday beside Aman Height caught on fire accident? Can anyone here confirm? Will it delay the construction further more?

Pisaro

Posts : 2
Join date : 2011-04-21

Back to top Go down

Re: Aman III Progress

Post by peygine on Wed Jun 19, 2013 10:30 am

Anyone got updated pic?? Laughing

peygine

Posts : 5
Join date : 2011-09-24

Back to top Go down

aman

Post by eyes1228 on Mon Jul 22, 2013 9:04 pm

a

eyes1228

Posts : 2
Join date : 2013-03-29

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Tue Jul 23, 2013 3:56 am

visited it last week, they are currently focusing on building up the parking lot... i guess becos they need to build a bridge across to aman 3 so they wanna do that 1st kot... i didnt c any progress on aman3 though... any1 from aman2 mind taking some photo of aman 3 from atop?

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by samjitkw on Tue Jul 30, 2013 7:30 am

Any new development surrounding Aman Heights especially the road access?? went to Aman Heights look at the project, as xavier said, they focus more on car park area, building itself not much different.

road access wise still the same, need to use the only main road climb up the hill only reach our condo :(any possibility that a new access road be opened behind the bungalows at Serdang Heights there?

samjitkw

Posts : 4
Join date : 2011-10-08
Age : 36
Location : Kuala Lumpur

Back to top Go down

Re: Aman III Progress

Post by Meira on Wed Jan 08, 2014 6:41 am

davidlow7 wrote:
cm wrote:
Meira wrote:
Meira wrote:End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.

As I understand from the documentation we have signed, they assumed the discount you have received will be considered as the offset of the delays claims. And I guess everyone of us has signed that document.

Check your S&P. This is the most ridiculous thing I have ever heard. I got LAD from PC. I accepted they pay me by installment though you can reject that.

From what I know .. is they will still compensate you but again with the discount of 5%... This is because of the 5% they give you as discount too...


Oh.. alright. Any news of when they will complete the whole block?

Meira

Posts : 4
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by davidlow7 on Thu Jan 16, 2014 6:12 pm

I am hoping if someone cares to post the latest progress for Aman C?

Thanks a lot

davidlow7

Posts : 5
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by samjitkw on Wed Feb 05, 2014 8:41 pm

davidlow7,

You can view the latest photos here

samjitkw

Posts : 4
Join date : 2011-10-08
Age : 36
Location : Kuala Lumpur

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Mon Feb 24, 2014 8:38 am

hi, if my snp is signed on august 2010 , does it mean if by august 2013 , premier consortium yet to hand off key.. we can start collecting compensation from them? looking at the progress i doubt it will be completed with cf by august.

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Mon Feb 24, 2014 6:42 pm

Jus like Aman I n II delay. Last time they gif Aman II buyer 2 options.
1.) They ask for discount on the total amount of compensation if u wanna to get it in one lump some.
2.) If u wanna to get full amount then they will pay u in 10 posted cheque.
So guy b ready on these.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Mon Feb 24, 2014 6:46 pm

Complete the building b4 end of tis year should b no problem but CCC (formerly know as CF) only God will know. Hopefully they din repeat the same history delay for about half year jus for the CCC due to local authorities not satisfy wif their things.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by Sponsored content


Sponsored content


Back to top Go down