Re: Aman III Progress

Post by TANHONGTAT on Thu Oct 11, 2012 3:11 pm

Hi Xavier !

The electric and water meter application notice comes last month. Have to pay PC RM380 for them to apply electric and water meter for us. Maybe you can try call them to check ASAP.

TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by peygine on Fri Oct 12, 2012 4:38 am

thanks for the updated pic Very Happy

peygine

Posts : 5
Join date : 2011-09-24

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Thu Oct 18, 2012 2:18 am

i did not received any letter asking me to pay rm380 le.... Wat floor are u guys which have received them? Are u guys those of which ur unit have been built or every1 is involved? And why isnt it being charged into our loan package instead charge separately? Confuse... 1st time buyer here... Could some1 enlight? Btw... Any1 from aman 2 mind taking some picture from their unit? Would like to have some bird eye view of the progress as well... Thx...

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Fri Oct 19, 2012 8:35 am

The RM380 is the deposit for ur application of electricity n water supply which is pay to TNB n Syabas but not developer. But make sure u get the official receipt from developer.

The developer just collect the money on behalf of TNB n Syabas. U can get back of ur deposit when u terminate ur electricity n water account from them. U need to fill the application form too. Tat y the money not loan into ur loan account.

Took few photos from AH II level 20 few days ago wif my hp. Will upload 2moro or Sun ya.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Fri Oct 19, 2012 8:51 am

tionwooi wrote:The RM380 is the deposit for ur application of electricity n water supply which is pay to TNB n Syabas but not developer. But make sure u get the official receipt from developer.

The developer just collect the money on behalf of TNB n Syabas. U can get back of ur deposit when u terminate ur electricity n water account from them. U need to fill the application form too. Tat y the money not loan into ur loan account.

Took few photos from AH II level 20 few days ago wif my hp. Will upload 2moro or Sun ya.
oo.. normally this kind of charges just apply to those unit which have been built or the whole AMIII tenant? as mine is on 17th floor.. last i c.. they only building 11 or 12 floor.. will there be any other charges coming after this water and electric charges? Question

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by klone7474 on Fri Oct 19, 2012 2:14 pm

i would not give the developer any money for the electric or the water. is better you apply by your self and pay them direct. it happen that developers took the money but did not pay to TNB or Synbas and run away. so be carefully.

klone7474

Posts : 24
Join date : 2011-11-25

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Fri Oct 19, 2012 5:54 pm

klone7474 wrote:i would not give the developer any money for the electric or the water. is better you apply by your self and pay them direct. it happen that developers took the money but did not pay to TNB or Synbas and run away. so be carefully.

huh? if i dont pay , the development can do nothing?

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Sun Oct 21, 2012 11:13 am

xavier668 wrote:
klone7474 wrote:i would not give the developer any money for the electric or the water. is better you apply by your self and pay them direct. it happen that developers took the money but did not pay to TNB or Synbas and run away. so be carefully.

huh? if i dont pay , the development can do nothing?

My advice is pay to developer but MAKE SURE u get the OFFICIAL RECEIPT from them. If anything happen in future at least u got the receipt as a proof.

One of my friend applied the water n electricity suppy by himself for his condo few years ago. Guess wat happen? TNB installed his meter almost same time wif other units but Syabas delay his meter installation more than 1.5 month due to the meter out of stock. He complained to Syabas n their answer was his application was not the same batch wif other units. Tat y Syabas din keep the stock for him.

Somebody may say tat the developer collected the deposit so early coz they need the money to roll. Actually most of the developers pratice the same coz TNB n Syabas may need time to process all the applications. Wat can I say is not much v can do if they really use our money to roll.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by tionwooi on Sun Oct 21, 2012 11:19 am

Some photos taken on 18.10.12 from Aman II (bird eye view). The progress is up to level 12.











avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman III Progress

Post by samjitkw on Thu Oct 25, 2012 2:17 pm

haha GW you are correct, typo error, is Dec 2014...this was what the girl told me Razz


Last edited by samjitkw on Thu Oct 25, 2012 2:20 pm; edited 1 time in total (Reason for editing : typo error)

samjitkw

Posts : 4
Join date : 2011-10-08
Age : 36
Location : Kuala Lumpur

Back to top Go down

Re: Aman III Progress

Post by Meira on Thu Nov 08, 2012 12:36 pm

End of December 2014 seems like delay for a year (12 months). Still acceptable if delay for 3 to 6 months. I'm starting to pay for the interest, and suppose to get it by 2013. Now I have to pay 1 more year interest for nothing? Hmmm.. any idea how we can proceed with the claiming? 12 months interest is not huge but is not little also leh.

Meira

Posts : 4
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by TANHONGTAT on Thu Nov 08, 2012 1:01 pm

After 36 months from your S&P date, you should able to claim back interest from the developer to offset whatever you have to paid
Very Happy

TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Fri Nov 09, 2012 3:41 am

Man...december 2014!!! tat is way to long.. i expect it to be ready by nex year around may-august!!! but looking at their rate and the difficulty of working around the clock due to "unforeseen" reasons... hais... guess need to prepare a contingency plan for myself liao

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Sat Nov 10, 2012 6:22 pm

hongtat ah, have the progress reach ur unit? May i ask Once reached the unit in possesion how much is the loan release ...?

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by TANHONGTAT on Sat Nov 10, 2012 6:36 pm

Hi Xavier. Yes reached already, they are constricting 14th floor now if not mistaken. Released 55% already up to date ~ Interest quite heavy also liao ~

TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Sun Nov 11, 2012 3:53 pm

TANHONGTAT wrote:Hi Xavier. Yes reached already, they are constricting 14th floor now if not mistaken. Released 55% already up to date ~ Interest quite heavy also liao ~
55% eh.. wow.. tat like half of the monthly installment d..

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by davidlow7 on Fri Nov 16, 2012 7:08 pm

Seems like it is up very fast.. I hope the quality is there and hope don't they finish up all floors but VP being delayed....

davidlow7

Posts : 5
Join date : 2012-10-11

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Fri Nov 16, 2012 7:14 pm

davidlow7 wrote:Seems like it is up very fast.. I hope the quality is there and hope don't they finish up all floors but VP being delayed....
ya meh? wat floor liao? Smile

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by yeepie on Sat Nov 17, 2012 11:32 am

still at lvl 13.
avatar
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Sun Nov 18, 2012 6:03 am

yeepie wrote:still at lvl 13.
ow tat is a standard slow pace le wa... not many worker working... maybe limited by no work rules for most of the time and the cash flow they have... hopefully they do a good job la..

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by yeepie on Sun Nov 18, 2012 11:23 am

then good luck to phase 3 owner
avatar
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Re: Aman III Progress

Post by Jeremy.t on Tue Nov 20, 2012 3:20 am

As long as they do it slow and quality, i am fine as to how long they take to build it up. Anyhow I am also one of the owner of AH3. Experience before with other condo's before when they rush... alot problems here n there especially water leaking from above... not a very good experience.

Cheers.

Jeremy.t

Posts : 1
Join date : 2012-11-13

Back to top Go down

Re: Aman III Progress

Post by xavier668 on Tue Nov 20, 2012 5:18 am

yea... same, i dont mind they are slow as long the QA is there... anyway, wat happen to the sales office at AM? the Aman Heights official website also seem like down d..

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Re: Aman III Progress

Post by yeepie on Wed Nov 21, 2012 6:31 am

believe me, there is no QA in AH lol!
All you need to do is perform a detail defect checking after VP and always monitor every corner of your unit to find the latest defect after you move in. You will found plenty of defects that could let u crazy, btw some defect you will only noticed after you moved in e.g. water leaking issue.

Just search the topic in forum you will see how we "enjoying" the defect fixing period and renovation issue due to unclear rules set by PC.

AH1 and AH2 owner all faced this before, so AH3 owner good luck to you.
avatar
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Re: Aman III Progress

Post by TANHONGTAT on Mon Nov 26, 2012 6:46 am

Anyone can enlight me is there this pipe in AH 1 and AH2 (Seems like connecting everyfloor. There is also some hole on top the toilet window, is it for ventilation of the plaster ceiling in bathroom?

Thanks


TANHONGTAT

Posts : 53
Join date : 2011-06-06

Back to top Go down

Re: Aman III Progress

Post by Sponsored content


Sponsored content


Back to top Go down