Sequence of renovation

+7
feihonglee
-Seng-
kelvin
thedude
tch
yap_ben
GW
11 posters

Page 1 of 2 1, 2  Next

Go down

Sequence of renovation Empty Sequence of renovation

Post by GW Mon Nov 22, 2010 6:35 am

To all the sifus who have renovation experience, what is the correct sequence for renovation if I want to do the below:
1. Electrical wiring (Fans, lights, air con, electrical points)
2. Plaster ceiling
3. Kitchen cabinet (include hood ducting hole)
4. Wardrobe
5. Painting
6. Door and window grills
Seems a dumb question but I need some advise Razz
Thanks!

GW

Posts : 743
Join date : 2009-11-27

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by yap_ben Thu Jan 06, 2011 10:42 pm

Bro,

So fast prepare for rennovation already. I think the wiring and plaster go together but will you go with an ID shop or just pick few you like. I have the same problem to figure out which to start first.
yap_ben
yap_ben
Global Moderators
Global Moderators

Posts : 688
Join date : 2009-01-06
Age : 40
Location : Seremban-Puchong-Cyberjaya

http://benzee.wordpress.com/

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Mon Jun 27, 2011 6:37 pm

I think i'll follow sequence below:-

1. Iron grill
2. Electrical wiring
3. Plaster ceilling
4. Fans, aircon, lighting point installation
5. Kitchen cabinet (hood, sink & etc)
6. Paint
7. Wardrobe & etc furniture (if i still got budget:p)

Any comments? My first time owning house of my own, hope everything smooth:)
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by thedude Mon Jun 27, 2011 7:00 pm

tch wrote:I think i'll follow sequence below:-

1. Iron grill
2. Electrical wiring
3. Plaster ceilling
4. Fans, aircon, lighting point installation
5. Kitchen cabinet (hood, sink & etc)
6. Paint
7. Wardrobe & etc furniture (if i still got budget:p)

Any comments? My first time owning house of my own, hope everything smooth:)

My experience lah....
Wiring
Aircond piping (without blower unit installation) and plumbing
Hole for your hob (if u r not using charcoal recycling system)
Plaster ceiling (most dusty job)
Paint
Grill (if u make grill first chances are the paint might got stuck on your grills)
Cabinets, hood, hob, aircond, lightings, fans, etc.
Furniture only in after all the dusty works are done.
thedude
thedude
Global Moderators
Global Moderators

Posts : 693
Join date : 2009-01-19

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by yap_ben Mon Jun 27, 2011 10:13 pm

I thought fitting the grille first so I can store my paint inside..but after thinking the plaster ceiling will kill my paint..pening already
yap_ben
yap_ben
Global Moderators
Global Moderators

Posts : 688
Join date : 2009-01-06
Age : 40
Location : Seremban-Puchong-Cyberjaya

http://benzee.wordpress.com/

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by kelvin Tue Jun 28, 2011 3:25 am

tch wrote:I think i'll follow sequence below:-

1. Iron grill
2. Electrical wiring
3. Plaster ceilling
4. Fans, aircon, lighting point installation
5. Kitchen cabinet (hood, sink & etc)
6. Paint
7. Wardrobe & etc furniture (if i still got budget:p)

Any comments? My first time owning house of my own, hope everything smooth:)

your one look ok, but the aircond must come before paster celing work so you can conceal and hiding your piping if you want, possible, the paint can come before fans and lighting installation. otherwise, the paint will easy kena all your wall light etc.
kelvin
kelvin
Global Moderators
Global Moderators

Posts : 838
Join date : 2008-12-31
Age : 42

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by -Seng- Tue Jun 28, 2011 8:10 am

My planning:

1. Grill
2. Electric Wiring,aircond piping
3, Plaster Ceiling
4, Aircond,Fans, Lighting,
5, Kitchen & Wardrobe
6. Paint

My Paint contractor ask me put at last. He said they can paint chun chun without "disturb" other stuff like kitchen cabinet or aircond.



Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-

-Seng-

Posts : 183
Join date : 2010-04-19
Age : 40

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by feihonglee Tue Jun 28, 2011 10:30 am

your Paint contractor charge how much to paint whole house?

feihonglee

Posts : 60
Join date : 2009-07-21

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by xavier668 Tue Jun 28, 2011 3:49 pm

-Seng- wrote:My planning:

1. Grill
2. Electric Wiring,aircond piping
3, Plaster Ceiling
4, Aircond,Fans, Lighting,
5, Kitchen & Wardrobe
6. Paint

My Paint contractor ask me put at last. He said they can paint chun chun without "disturb" other stuff like kitchen cabinet or aircond.



Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-

but i thought u need to do aircond b4 u do plaster ceiling to conceal the piping ? Wink

xavier668

Posts : 115
Join date : 2011-06-14

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Tue Jun 28, 2011 4:52 pm

thedude wrote:
tch wrote:I think i'll follow sequence below:-

1. Iron grill
2. Electrical wiring
3. Plaster ceilling
4. Fans, aircon, lighting point installation
5. Kitchen cabinet (hood, sink & etc)
6. Paint
7. Wardrobe & etc furniture (if i still got budget:p)

Any comments? My first time owning house of my own, hope everything smooth:)

My experience lah....
Wiring
Aircond piping (without blower unit installation) and plumbing
Hole for your hob (if u r not using charcoal recycling system)
Plaster ceiling (most dusty job)
Paint
Grill (if u make grill first chances are the paint might got stuck on your grills)
Cabinets, hood, hob, aircond, lightings, fans, etc.
Furniture only in after all the dusty works are done.

i thought aircon piping already provided by developer? saw some holes on wall, not sure for aircon or what:)
still thinking should locate wet kitchen on yard area or just leave yard for washing machine only.
grill i plan to re-paint again, as a lot of welding sure cause a lot of paints to peel off.
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by feihonglee Tue Jun 28, 2011 8:18 pm

better do coating paint, tahan 10 yrs

feihonglee

Posts : 60
Join date : 2009-07-21

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by LUCAS Wed Jun 29, 2011 8:17 am

only aircon hole is provided,no piping...tats y u nd plaster ceiling
LUCAS
LUCAS
Moderators
Moderators

Posts : 411
Join date : 2009-10-08

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Wed Jun 29, 2011 8:04 pm

feihonglee wrote:better do coating paint, tahan 10 yrs

plan to swipe off the poor paint works from developer, then re-paint again, with better surface foundation i bet even normal paint can last longer than any expensive paint lying on top of developer "cement paint" :p
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Wed Jun 29, 2011 8:14 pm

LUCAS wrote:only aircon hole is provided,no piping...tats y u nd plaster ceiling

my friend who just reno his house also suggest me to do aircon piping and electrical wiring first before plaster ceiling, since i'm not planning to put on plaster for kitchen i guess can do kitchen cabiner same time as well:)
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by kelvin Thu Jun 30, 2011 11:06 am

anyone who want do wall skimming can let me know, I got ppl to introduce Embarassed
kelvin
kelvin
Global Moderators
Global Moderators

Posts : 838
Join date : 2008-12-31
Age : 42

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Thu Jun 30, 2011 6:20 pm

kelvin you got any good intro for electrical wiring & aircon piping? still wondering where to source, don't want to go thru those bao kah liao contractors, else sure need to pay extra commission since they outsource also....
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tionwooi Thu Jun 30, 2011 7:40 pm

tch wrote:kelvin you got any good intro for electrical wiring & aircon piping? still wondering where to source, don't want to go thru those bao kah liao contractors, else sure need to pay extra commission since they outsource also....

Mayb one stop contractor a bit expensive, but it can save us a lot of time n energy.
V can find few contractors if v really hv time to monitor them.
If not v will headache when the contractors misunderstanding wif each other or they din coordinate well!
End up v need to pay extra to correct their mistake since nobody will take the responsible.
I learnt tis from my aunt's experince end of last year.

V still can save cost even v go thru one stop contractor like v provide them paint, downlight n other material.....
So far I found an one stop contractor wif reasonable price. Their quotation for me not too expensive compare to the price of few contractors.

tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Fri Jul 01, 2011 7:39 am

tion wooi, thanks for the advice, certainly helps! cheers

i don't have much time to check price and monitor, worse still my budget on tight ends:(

think i'll go with one stop contractor if price does not differ much, easier since whatever reno needs to go thru management. I'll go buy material then maybe cvan bring the cost down a bit. Mind to share the one stop contractor contact you mentioned? Smile
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by GW Mon Jul 04, 2011 4:02 am

I want to ask, will it affect a lot if I install the grills first? I spoke to contractor, they advise me to buy my own downlight, aircon, lights, fans and paint. They will do the wiring, installation and paintjob..
So I have no place to keep my stuff without grill. I plan to install all grills first upon defects complete by developer, then use the utility/store room to store all these barang.
Anybody can advise, besides the painting may kena the grill, any other things to consider?
Dilemma now as I also missed out a great promotion for Bosch washer yesterday at IPC. The front loader 7kg type just going for 1699 but they can only keep for 1 month... Sad

GW

Posts : 743
Join date : 2009-11-27

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by yap_ben Mon Jul 04, 2011 7:41 am

tch,
Bro, if this week morning you're free then we can meet up at AH maybe at your unit to discuss more about the one stop.

GW,
I've the same plan with you but I think if they want to do it nice for you sure wont kena your grill. If they want to complete fast then sure kena..I went to one of the ID they told me the last step is paint..i'm little confuse already..
yap_ben
yap_ben
Global Moderators
Global Moderators

Posts : 688
Join date : 2009-01-06
Age : 40
Location : Seremban-Puchong-Cyberjaya

http://benzee.wordpress.com/

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Mon Jul 04, 2011 8:00 am

ben, this weekend i might be going back my home town ipoh, but yet confirm, shall ping you if drop by:)

plan to call up some contractors for plaster ceiling and wiring, did 2 kitchen cabinet/wardrobe/kitchen wall cut frame last sat, price quite steep for my budget, shall sahre with you guys later:)
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tionwooi Mon Jul 04, 2011 8:58 am

tch wrote:ben, this weekend i might be going back my home town ipoh, but yet confirm, shall ping you if drop by:)

plan to call up some contractors for plaster ceiling and wiring, did 2 kitchen cabinet/wardrobe/kitchen wall cut frame last sat, price quite steep for my budget, shall sahre with you guys later:)

Wow, I'm oso Ipoh guy leh! Ha...
tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by yap_ben Mon Jul 04, 2011 10:00 am

tch,
mind share the price that you've?

tionwooi,
you got kaki to balik kampung during CNY
yap_ben
yap_ben
Global Moderators
Global Moderators

Posts : 688
Join date : 2009-01-06
Age : 40
Location : Seremban-Puchong-Cyberjaya

http://benzee.wordpress.com/

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Mon Jul 04, 2011 8:28 pm

tionwooi wrote:
tch wrote:ben, this weekend i might be going back my home town ipoh, but yet confirm, shall ping you if drop by:)

plan to call up some contractors for plaster ceiling and wiring, did 2 kitchen cabinet/wardrobe/kitchen wall cut frame last sat, price quite steep for my budget, shall sahre with you guys later:)

Wow, I'm oso Ipoh guy leh! Ha...

haha, finally got kaki ipoh mali:p jocolor
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by tch Mon Jul 04, 2011 8:41 pm

yap_ben wrote:tch,
mind share the price that you've?

hi ben, just did abit ard equine area last sat:-

kitchen cabinet - same length like showroom, only exclude units above fridge, melamine abs ard 3320, if change worktop to solid add another 2110 affraid

wall cut frame - that big hole between kitchen & dining room, use melamine also, put extra 1 feet extension on bottom to hold dishes, 635

5ft till top wardrobe in master room (next to bathroom), sliding door, antijump n etc, 1470

double sink - 300

plumbing works to fit sink - 180 (DIY la:p)

install hood, hob & sink - 100 (reasonable)

cheapest branded hood ard 300, hob ard 150-200. I was thinking should go for convention stove instead of hob and replace hood with induction fan, saving not significant but definately more practical & efficient. good hood price ard 1.5k pale

visited another shop, similiar kitchen cabinet, concrete 5.8k, granite 6270, solid 5820, woodtop 4020, claimed to have good reputation for years in lowyat forum, very nice sales girl:) their 5 feet wardrobe with mirror sliding doors cost almost 1750.

enough cabinet & wardrobe, shall go for piping, wiring & plaster ceiling quote this & next week, stay tuned:)
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Sequence of renovation Empty Re: Sequence of renovation

Post by Sponsored content


Sponsored content


Back to top Go down