AMAN HEIGHTS COMMUNITY FORUM

Aman II Progress

Page 4 of 7 Previous  1, 2, 3, 4, 5, 6, 7  Next

View previous topic View next topic Go down

Re: Aman II Progress

Post by kelvin on Tue Aug 11, 2009 3:33 pm

lol, mine is minor complain lor, i heard some ppl complain till they have to change main door, tiles etc..... Suspect
avatar
kelvin
Global Moderators
Global Moderators

Posts : 838
Join date : 2008-12-31
Age : 36

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Tue Aug 11, 2009 6:14 pm

kelvin wrote:dun worry, i guess it is normall for all the worker now doing the touch up for AH I, dun forget they need to attend to all 266 unit for AH I defect complain within 30 days according to S&P.

after this I am sure they will go back go normal progress.

cheers :p

Hopefully everything ok like wat Kelvin said lah! Rolling Eyes
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Wed Aug 19, 2009 9:40 pm

After stopped for 3 weeks times, finally Aman II construction resume again! Very Happy

25th floors of Aman II still under construction but they hv start to build 26th floors now. The brick walls now up to 23rd floors already but haven fully complete. Beside, wat v can c is the window frames' installation only up to 10th or the highest 12th floors.

Hopefully Aman II will keep on the progress n finish the whole block by end of August! Cheers! sunny







avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by JiNG on Thu Aug 20, 2009 7:51 am

wow wow.. Thanks man .... This looks promising.. the wall brick almost catching up with the building progress.. great... we might be able to see some window or paints soon. wu hu.... hehe
avatar
JiNG

Posts : 495
Join date : 2009-07-02

Back to top Go down

Re: Aman II Progress

Post by Jes on Fri Aug 21, 2009 5:11 am

Hurray!!! Hopefully already will go smooth.... Smile

Jes

Posts : 71
Join date : 2009-07-13

Back to top Go down

Re: Aman II Progress

Post by Jes on Wed Sep 02, 2009 5:31 am

Any update for Aman II ar?

Jes

Posts : 71
Join date : 2009-07-13

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Wed Sep 02, 2009 8:20 am

Recently the contruction of Aman II stop again. I'm not sure wat is the reason behind. I think the developer currently focus on Aman I CF issue n temporary put Aman II aside.

If tis is the fact, tat mean once Aman I haven get the CF, Aman II progress will b affected. I hope tat 2day 3rd inspection of MPSJ will pass n Aman I CF will out very very soon. After settle all tis issue then only the developer can focus back on Aman II.

Pray hard for Aman I n oso Aman II ya, all of my neighbours!
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Wed Sep 02, 2009 4:01 pm

Below are some Aman II photos which I took on 22.08.09





Below are some Aman II photos which I took on 29.08.09. Altho these photos I took after 1 week time but wat v can c is Aman II never show much progress compare to the photos above.





avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by JiNG on Thu Sep 03, 2009 7:50 am

Haha... the dinding sudah siap.. hehe
avatar
JiNG

Posts : 495
Join date : 2009-07-02

Back to top Go down

Re: Aman II Progress

Post by Jes on Mon Sep 14, 2009 4:25 am

Any update for Aman II progress ar?

Jes

Posts : 71
Join date : 2009-07-13

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Tue Sep 15, 2009 8:05 am

Guys, here is some photos I took when I visited AH last Sunday (13.09.09). I went up to 26 floors in Aman I n shooted the photos. The brick walls now up to 24th floors already but haven fully done. I oso saw few workers were working there. Finally I saw they were working on Aman II but the progress was so sloooooooooooooooow!

Aman II still got 39 units unsold. It seem like dun hv any sale come in since few months ago.















avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by Jes on Tue Sep 15, 2009 9:05 am

Hi, tionwooi. Thanks for all ur effort for taking this photos.

Jes

Posts : 71
Join date : 2009-07-13

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Wed Sep 16, 2009 7:02 pm

Jes wrote:Hi, tionwooi. Thanks for all ur effort for taking this photos.

U r welcome, Jes! Very Happy
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by kpl_smile on Thu Sep 17, 2009 11:14 am

kelvin wrote:lol, mine is minor complain lor, i heard some ppl complain till they have to change main door, tiles etc..... Suspect

i m one of that, request to change the main door, lock at room 3, master room window, 2nd bedrooom window, tiles at kitchen then even asked them the skim coat again my whole unit... pale

kpl_smile

Posts : 27
Join date : 2009-06-26
Location : seri kembangan

Back to top Go down

Re: Aman II Progress

Post by ting on Fri Sep 18, 2009 11:51 am

kpl_smile wrote:
kelvin wrote:lol, mine is minor complain lor, i heard some ppl complain till they have to change main door, tiles etc..... Suspect

i m one of that, request to change the main door, lock at room 3, master room window, 2nd bedrooom window, tiles at kitchen then even asked them the skim coat again my whole unit... pale

U need to pay more for the request or not?

ting

Posts : 102
Join date : 2009-09-10

Back to top Go down

Re: Aman II Progress

Post by kpl_smile on Fri Sep 18, 2009 5:35 pm

nope. i not need to pay any for the request...these are defects....workmanship for higher level is not good if compare to lower lever unit. May b they rush to hand over that time.

kpl_smile

Posts : 27
Join date : 2009-06-26
Location : seri kembangan

Back to top Go down

Re: Aman II Progress

Post by JiNG on Wed Sep 23, 2009 8:13 am

the higher it is... may be the indon do until sien d... haha..
avatar
JiNG

Posts : 495
Join date : 2009-07-02

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Wed Sep 30, 2009 3:58 pm

Those are the photos I took yesterday. The brick wall for 24th floors already done if compare to the photos I took on 13.09.09. But 25th floors n 26th floors works still pending there.







avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Mon Oct 12, 2009 6:53 pm

2day went to AH, no progress at all for 26th floors. Jus got a little different (I mean progress) for the wall on 25th floors. Anyway I saw 2 workers working on 11 / 12 floors, they seem like installing the window frames.

Premier Consortium pls built my house faster lah. Dun act like a snail, so slo.....................w!!!!!! Mad
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by ting on Tue Oct 13, 2009 8:33 am

seems like they dun hv money to hire more workers to work on that....how come juz 2 workers for such a big project...i wonder tis developer will bankrupt or nt...

ting

Posts : 102
Join date : 2009-09-10

Back to top Go down

Re: Aman II Progress

Post by JiNG on Tue Oct 13, 2009 8:58 am

Stop making us worried lar... hows your consideration about AH2 d? decided to buy?
avatar
JiNG

Posts : 495
Join date : 2009-07-02

Back to top Go down

Re: Aman II Progress

Post by tionwooi on Tue Oct 13, 2009 6:29 pm

ting wrote:seems like they dun hv money to hire more workers to work on that....how come juz 2 workers for such a big project...i wonder tis developer will bankrupt or nt...

I said I saw 2 workers working outside but I dun know where are the others workers. I'm not sure. Mayb inside the building since I'm not allow enter Aman II.

If the developer 1 2 bankrupt then they still need to apply CF for Aman I for wat? No point wat! If I'm the developer, I wont let my selves bankrupt. Once Aman I get their CF, I'm sure tis will push the sale of Aman II n Aman III. So if I'm the developer, I wont let go tis profitable chance.
avatar
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 37
Location : Seri Kembangan

Back to top Go down

Re: Aman II Progress

Post by Jes on Wed Oct 14, 2009 4:19 am

At the moment, we can't really say anything abt the developer. Just let is be.... Wat we can do now is just pray Aman I and Aman II go smooth as we all already signed the SPA and bank has already release partially loan to the developer. So we just wait lor.

Jes

Posts : 71
Join date : 2009-07-13

Back to top Go down

Re: Aman II Progress

Post by JiNG on Wed Oct 14, 2009 7:43 am

This is the correct thinking.. Smile
avatar
JiNG

Posts : 495
Join date : 2009-07-02

Back to top Go down

Re: Aman II Progress

Post by Kelly on Wed Oct 14, 2009 8:33 am

AHI not settle down yet n AHII still in slowwww.. progress, the day seems so near but so far.... Sad

Kelly

Posts : 39
Join date : 2009-07-02
Location : Seri Kembangan-Puchong

Back to top Go down

Re: Aman II Progress

Post by Sponsored content


Sponsored content


Back to top Go down

Page 4 of 7 Previous  1, 2, 3, 4, 5, 6, 7  Next

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum