Renovation Plan for 2011

+16
-Seng-
raymondt
LUCAS
tionwooi
chumi4
kelvin
Calvin
Jes
DinKnight
T
thedude
christine fong
yap_ben
yeepie
GW
madoct10
20 posters

Page 3 of 5 Previous  1, 2, 3, 4, 5  Next

Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by Calvin Tue Jun 21, 2011 11:52 am

thanks Yeepie.actually already registered for almost. 2yrs.now wana have small wedding dinner only.2 thongs come 2gether,worry vitamin M not enough..:p

Calvin

Posts : 150
Join date : 2009-07-09

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Tue Jun 21, 2011 12:18 pm

step by step lor Cool

we also not enough vit M, so just do basic reno + repainting.
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by Calvin Tue Jun 21, 2011 12:27 pm

yalo.step by step...so only do simple reno..

Calvin

Posts : 150
Join date : 2009-07-09

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Tue Jun 21, 2011 12:50 pm

Calvin you going AH this weekend right? Can help to confirm with management office why there is no piping under the sink, basin and toilet bowl...

Is it they only fix/install them during we request them help to install the loose items (all water taps) that they given to us during VP?

It will be a cost a lot to us if they not provide those piping.
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by Calvin Tue Jun 21, 2011 1:18 pm

Yaya..going this sat.no problem.will ask for u.I need to check mine one as well cz din realize this part.but I saw sink at kitchen got piping under it.

Will update to u once get the info from them.

Calvin

Posts : 150
Join date : 2009-07-09

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by -Seng- Tue Jun 21, 2011 3:39 pm

yeepie wrote:CONGRATZ to seng become a great father soon and Calvin and Mrs. Calvin marriage Razz

Thanks ! Money not enuf T_T


Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-


-Seng-

Posts : 183
Join date : 2010-04-19
Age : 40

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by Calvin Tue Jun 21, 2011 3:51 pm

seng, money never enough..Razz

Calvin

Posts : 150
Join date : 2009-07-09

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tionwooi Tue Jun 21, 2011 6:17 pm

-Seng- wrote:
yeepie wrote:CONGRATZ to seng become a great father soon and Calvin and Mrs. Calvin marriage Razz

Thanks ! Money not enuf T_T


Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-


I can understand Seng felling.
Tat y he tries very hard to earn money now coz he is advertising his Unifi on every posts
Ha....... What a Face
tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by thedude Tue Jun 21, 2011 7:29 pm

yeepie wrote:Calvin you going AH this weekend right? Can help to confirm with management office why there is no piping under the sink, basin and toilet bowl...

Is it they only fix/install them during we request them help to install the loose items (all water taps) that they given to us during VP?

It will be a cost a lot to us if they not provide those piping.

Piping, taps, shower heads, etc. should be included. The last time even the toilet roll holders are given out.
thedude
thedude
Global Moderators
Global Moderators

Posts : 693
Join date : 2009-01-19

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tionwooi Tue Jun 21, 2011 7:34 pm

yeepie wrote:Calvin you going AH this weekend right? Can help to confirm with management office why there is no piping under the sink, basin and toilet bowl...

Is it they only fix/install them during we request them help to install the loose items (all water taps) that they given to us during VP?

It will be a cost a lot to us if they not provide those piping.

I'm confirmed tat they will install all these loose items for us coz I asked this question to them too last Sat.
They told me jus inform the management office once v need it. Wink
tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by -Seng- Wed Jun 22, 2011 2:42 am

tionwooi wrote:
-Seng- wrote:
yeepie wrote:CONGRATZ to seng become a great father soon and Calvin and Mrs. Calvin marriage Razz

Thanks ! Money not enuf T_T


Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-


I can understand Seng felling.
Tat y he tries very hard to earn money now coz he is advertising his Unifi on every posts
Ha....... What a Face


Mr TW,

Dont zha me ler...



Get your Unifi/Streamyx here
Save your time, I will do it for you Very Happy

-Aman Heights B-1-9 owner-

-Seng-

Posts : 183
Join date : 2010-04-19
Age : 40

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Wed Jun 22, 2011 5:14 am

tionwooi wrote:
yeepie wrote:Calvin you going AH this weekend right? Can help to confirm with management office why there is no piping under the sink, basin and toilet bowl...

Is it they only fix/install them during we request them help to install the loose items (all water taps) that they given to us during VP?

It will be a cost a lot to us if they not provide those piping.

I'm confirmed tat they will install all these loose items for us coz I asked this question to them too last Sat.
They told me jus inform the management office once v need it. Wink

Tionwooi, i not mean installing those tap... i mean the missing piping that will connected with those loose item. Example under the basin there is no piping connected to the basin for installing the water tap. This happen at basin, toilet bowl and kitchen sink.
i believe it is a missing item, maybe we need to fill the missing items form at sales room.
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Wed Jun 22, 2011 5:22 am

I plan to do tiles table top for my KC.
Yesterday went to 1st tiles shop to survey the price.
MML tiles black polished – RM31 per piece
MML tiles grey polished – RM29 per piece
White horse dark grey polished – RM 38 per piece

China tiles black polished – RM22

anyone can sharing your survey
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tionwooi Wed Jun 22, 2011 6:26 am

yeepie, wat u mean is the piping which connect the basin water tap to the wall pipe like the pic shown below?

Renovation Plan for 2011 - Page 3 Pipe10
tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Wed Jun 22, 2011 6:47 am

Yes, i mean these piping. All these piping had missing the water pipe only have pipe end stopper.
The worst is the kitchen pipe is incomplete and they not install connector for put the end stopper at the L-shape pipe connector in the wall.
If they not fix this and someone connect the water source… the whole unit will be flood.
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yap_ben Wed Jun 22, 2011 7:51 am

Gosh! another thing need to remember for this coming saturday inspection. BTW I would like to know where do you guys planning to install the pipe that stop the water coming into the unit?
yap_ben
yap_ben
Global Moderators
Global Moderators

Posts : 688
Join date : 2009-01-06
Age : 40
Location : Seremban-Puchong-Cyberjaya

http://benzee.wordpress.com/

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Wed Jun 22, 2011 9:25 am

We are don't know how developer conceal the main piping, even we know we also need to hack the wall for install the main valve.
Alternatively you can install the valve at under the kitchen sink.
For bathroom there already pre-installed the valve somewhere near the shower.

yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by thedude Wed Jun 22, 2011 5:57 pm

yap_ben wrote:Gosh! another thing need to remember for this coming saturday inspection. BTW I would like to know where do you guys planning to install the pipe that stop the water coming into the unit?

You can do that? That'll be great coz as of now if my pipe were to burst in the middle of the night, my only backup plan is a drill to bust open the meter room door... muahahaha....
thedude
thedude
Global Moderators
Global Moderators

Posts : 693
Join date : 2009-01-19

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tionwooi Wed Jun 22, 2011 7:14 pm

yeepie wrote:We are don't know how developer conceal the main piping, even we know we also need to hack the wall for install the main valve.
Alternatively you can install the valve at under the kitchen sink.
For bathroom there already pre-installed the valve somewhere near the shower.



No need hack the wall, the valve can install outside after the wall piling.
Beside, I think they will included the piping u mention b4. If not how they want to install for us.
Dun tell me v need to buy it for them to install for us. For sure I'll screw them "gao gao"!
tionwooi
tionwooi
Global Moderators
Global Moderators

Posts : 682
Join date : 2009-04-27
Age : 44
Location : Seri Kembangan

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by yeepie Thu Jun 23, 2011 4:32 am

i feel i just get a partial finished unit after look at all of the defect and mising items!! lol!
yeepie
yeepie

Posts : 407
Join date : 2009-06-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tch Thu Jun 23, 2011 7:47 am

yeepie wrote:i feel i just get a partial finished unit after look at all of the defect and mising items!! lol!

you are not alone, one of my door knob fell off and i'm unable to open the door when i check out my unit yesterday lol!

tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by madoct10 Thu Jun 23, 2011 4:37 pm

so afraid to look at my unit...waaaaaaaaaaa pale
madoct10
madoct10

Posts : 66
Join date : 2010-09-29

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by feihonglee Tue Jun 28, 2011 10:41 am

yo bro,

Let's arrange a gathering to discuss the reno plan and bring ur quote to compare with each other. what u say?

2/7 Sat - evening free
3/7 Sun - whole day free

feihonglee

Posts : 60
Join date : 2009-07-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by tch Tue Jun 28, 2011 4:55 pm

feihonglee wrote:yo bro,

Let's arrange a gathering to discuss the reno plan and bring ur quote to compare with each other. what u say?

2/7 Sat - evening free
3/7 Sun - whole day free

+1 here, shall drop by AH this coming sat or sun too, time & venue? Very Happy
tch
tch

Posts : 311
Join date : 2009-09-17
Location : AH2 9th floor :)

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by feihonglee Tue Jun 28, 2011 8:14 pm

prefer sunday after lunch, let's say 2pm at AH cafeteria.

feihonglee

Posts : 60
Join date : 2009-07-21

Back to top Go down

Renovation Plan for 2011 - Page 3 Empty Re: Renovation Plan for 2011

Post by Sponsored content


Sponsored content


Back to top Go down